2007 Package IV
Construction commenced March 26, 2009 and is expected to be completed by September 23, 2009.
- Treaschwig Road at Banquo Drive
- Traffic signalization with pedestrian signals and ADA wheelchair ramps including installation of an east bound left turn lane
- Will Clayton Parkway at Woodland Hills Drive
- Traffic signalization with pedestrian signals, ADA wheelchair ramps and crosswalk
2007 Package V
Construction commenced August 7, 2009 and is expected to be completed by December 6, 2009.
- North Eldridge Parkway at Crossroads Park Drive
- Traffic signalization with pedestrian signals, ADA wheelchair ramps and crosswalk
- Spring Cypress Road at Louetta Road
- Traffic signalization with pedestrian signals, ADA wheelchair ramps and crosswalk
- Spring Cypress Road at Village Creek Trail
- Traffic signalization with pedestrian signals, ADA wheelchair ramps and crosswalk
- West Little York Road at Evergreen Trails/Enclave Vista Drive
- Traffic signalization with pedestrian signals, ADA wheelchair ramps and crosswalk
2007 Package VI
Package VI is in the design phase.
- Atascocita Road at Atascocita Meadows Drive
- Installation of a left turn lane on Atascocita Road
- Atascocita Road at Atasca Oaks Drive
- Traffic signalization with pedestrian signals, ADA wheelchair ramps, crosswalk and southbound turn lane on Atascocita Road
- Atascocita Road at Will Clayton Parkway
- Installation of dual left turn lanes on Will Clayton Parkway
- West Little York Road at Guhn Road
- Intersection improvements including traffic signalization with pedestrian signals, ADA wheelchair ramps, and crosswalk
West Road at Gessner Road
Proposed improvements include the installation of a traffic signal system, pedestrian signals, ADA wheelchair ramps, and an extension of the Gessner Road northbound left turn lane. Construction activity commenced August 25, 2009 and is scheduled for completion November 8, 2009.
Congestion Mitigation Air Quality Program Traffic Management System
Precinct 4 and the Harris County Public Infrastructure Department-Engineering Division, Traffic and Transportation Group determined traffic management systems were needed to improve the level of service on many of the major corridors within Precinct 4.
The traffic management system incorporates the installation of intersection improvements and/or traffic signals or traffic signal modifications integrated with a fiber optic interconnect system. The fiber optic interconnect system allows for an improved method of synchronizing the traffic signals and monitoring the system to ensure it is working as designed.
This is a joint participation project between Harris County and the Texas Department of Transportation (TxDOT). Precinct Four is responsible for the project design and funding 20% of the construction costs. TxDOT will fund 80% of the construction costs, bid/award and manage the construction activity. TXDOT let the CMAQ II project on August 8, 2007 and notice to proceed was given on November 19, 2007. Signal construction is now complete. Installation of the fiber optic interconnect system is scheduled to commence in the 2nd quarter of 2010.
West Road Corridor between Highway 6 to Gessner Road
Note: The fiber optics will run along West Road from Highway 6 to Gessner Road then on Gessner Road from West Road to West Little York Road and finally along West Little York Road from Gessner Road to Hollister Road.
New signals were installed at the following locations.
- Cabin Creek Drive
- East Commons Drive
- Ranchstone Drive
- Steepleway Boulevard
- Willowbridge Park Drive
- Deer Trail Drive
Bammel North Houston Corridor between Smiling Wood Lane (south of SH 249) to FM 1960
- Klein Meadow Drive/ Bourgeois Road with Left Turn Lane modifications
- Including Gessner Road at West Gulf Bank Road