A complete listing of Capital Improvement Projects.

Project Name Limit From Limit To Keymap Internet Notes
Aldine Westfield Rd E Louetta Rd Riley Fuzzell Rd 292L 292R 292Q Planned improvements include upgrading the existing 2-lane asphalt roadway to a 4-lane concrete pavement section with appropraite drainage system, and all appurtenances necessary for realizing a completed project. Project is currently in the Study phase. (Last Updated On 4/16/2014)
Boudreaux Rd 2500 ft W of S Hwy 249 3500 ft E of S Hwy 249 328C 328D 288Z Planned improvements included extending Boudreaux Road, from approximately 2,500’ west of SH 249 to SH 249 and realigning Boudreaux Road from SH 249 to 3,500’ east of SH 249 as a 4-lane concrete roadway with a 14’ median, open ditch drainage system and all appurtenances necessary for realizing a complete project. Close coordination with the Harris County Toll Road Authority (SH 249 mainlane improvements) and the Texas Department of Transportation (Grand Parkway Segment F1) was necessary for addressing the drainage accommodations and construction related efforts. The new sections of Boudreaux Road, east and west of SH 249, are now open to the traveling public [4/14/14]. (Last Updated On 4/16/2014)
Gosling Rd Spring Stuebner Rd W Mossy Oaks Rd 290M Improvements include widening Gosling Road to a 5-lane concrete pavement with appropriate drainage system within a 100-foot right of way including an at-grade railroad crossing at the UPRR. Project is currently in the Design Phase and it is Precinct 4's goal to seek bid authorization in the first quarter of 2015. (Last Updated On 4/16/2014)
Grand Pkwy - F1 and F2 US 290 IH 45 445T Proposed 4-lane divided roadway also known as SH 99. Project development is being managed by the Texas Department of Transportation (TxDOT). For more information contact TxDOT at (713) 802-5000. (Last Updated On 4/16/2014)
Grant Rd Old Kluge Rd Spring Cypress Rd 328T Proposed improvements include upgrading the existing 2-lane asphalt roadway to a 4-lane concrete boulevard section with storm sewer system, traffic signalization or signal modifications as warranted and all appurtenances necessary for realizing a completed project. Project is currently in the engineering design phase and our goal is to publish the project for bidding purposes the second quarter of 2014. (Last Updated On 4/16/2014)
Holzwarth Rd - North 675 north of Emerson Ridg Spring Stuebner Rd 292N Proposed improvements include installation of a 4-lane concrete boulevard section within a 100-foot right of way including low impact development components and a storm sewer system. The bid was awarded to Allgood Construction Company, Inc. and construction is expected to commence the second quarter of 2014. (Last Updated On 4/16/2014)
Holzwarth Rd - South FM 2920 675 n of Emerson Ridge 292N Proposed improvements include upgrading the existing combination 44-foot concrete pavement section and half-boulevard section to a 4-lane concrete boulevard section within a 100-foot right of way. The project was awarded to D&W Contractors, Inc and Notice to Procced was given January 2014. Completion of the roadway project is scheduled for May 21, 2014 [barring unforeseen circumstances beyond the Contractor's control, i.e, excessive inclement weather during the course of the contract.] (Last Updated On 4/16/2014)
Hufsmith Kohrville-6 Rd Willow Creek Estates Ln FM 2920 289E Planned improvements include upgrading the existing 2-lane asphalt roadway to a 4-lane concrete boulevard section with storm sewer system or 5-lane concrete pavement with open ditch drainage accommodating low impact components addressing water quality needs, traffic signals or traffic signal modifications as warranted and all appurtenances necessary for realizing a complete project. Project is in the Study phase. (Last Updated On 4/16/2014)
Hufsmith-Kohrville at Holderrieth 289T The necessary traffic engineering investigations have been accomplished to warrant the installation of a traffic signal system on Hufsmith-Kohrville at Holderrieth Road. Planned improvements include installation of a northbound to westbound and eastbound to northbound left turn lane. This is a Joint Participation project between Harris County and the Tomball Economic Development Corporation. (Last Updated On 4/16/2014)
Hufsmith-Kohrville Rd 400 S of Spring Cypress Rd Hollow Glen Ln 329F Proposed improvements include upgrading the existing 2-lane asphalt roadway to a 4-lane concrete boulevard section with storm sewer system, traffic signalization or signal modifications as warranted and all appurtenances necessary for realizing a completed project. The Design phase of the Project is complete and our goal is to publish the project for bidding purposes in May 2014. (Last Updated On 4/16/2014)
Louetta North Rd Blanco Trails Ln Telge Rd 328S Proposed improvements include extending Louetta Road as a 4-lane concrete pavement section, with appropriate drainage accommodations, traffic signalization, and all appurtenances necessary for realizing a complete project. Project is currently in the Study phase. (Last Updated On 4/16/2014)
Louetta Rd Imperial Woods Ln Cypress Ridge Dr 328X Proposed improvements include widening Louetta Road to a 4-lane concrete boulevard section including a traffic signal system on Louetta Road at Longwood Trace Drive. Project is currently in the bid and award phase. The successful low bidder is expected to mobilize in the second quarter of 2014. (Last Updated On 4/16/2014)
Louetta Rd at Kuykendahl Rd 331B Intersection improvements (right turn lanes and modified left turn lanes) were completed on October 29, 2009. Additional improvements will include the deployment of a Changeable Lane Assignment Signal System (CLASS) at the intersection of Kuykendahl Road at Louetta Road. CLASS provides the ability to integrate operations between the traffic signal control system and the CLASS application allowing lane assignments to change with the traffic patterns for better intersection management. This is a joint participation project between Harris County and the Texas Department of Transportation. The expected completion date is December 2013. (Last Updated On 4/16/2014)
N Eldridge Pkwy at Northpointe Blvd 329E The necessary traffic engineering investigations have been accomplished to warrant the installation of a traffic signal system on Northpointe Boulevard at North Eldridge Parkway. Project is currently in the design phase. (Last Updated On 4/16/2014)
North Eldridge Pkwy at Malcomson Rd 328Z The necessary traffic engineering investigations have been accomplished to warrant the installation of a traffic signal system on North Eldridge Parkway at Malcomson Road including westbound and eastbound left turn lanes on Malcomson Road. The project was awarded to Statewide Traffic and Notice to Proceed was given March 2014. Completion of the project is scheduled for May 2014. (Last Updated On 4/16/2014)
North Eldridge Pkwy at West Little York Rd 408Z Intersection improvements (right turn lanes and modified left turn lanes) were completed on October 29, 2009. Additional improvements include the deployment of a Changeable Lane Assignment Signal System (CLASS) at the intersection of North Eldridge and West Little York. CLASS provides the ability to integrate operations between the traffic signal control system and the CLASS application allowing lane assignments to change with the traffic patterns for better intersection management. This is a joint participation project between Harris County and the Texas Department of Transportation. The expected completion date is December 2013. (Last Updated On 4/16/2014)
Riley Fuzzel Rd Aldine Westfield Rd Hardy Toll Rd 292M Planned improvements include upgrading the existing 2-lane asphalt roadway to a 5-lane concrete pavement section with appropriate drainage system, and all appurtenances necessary for realizing a complete project. Project is currently in the Design Phase and is expected to be bid for construction purposes in the 2nd quarter of 2015. (Last Updated On 4/16/2014)
Spring Cypress Rd IH 45 Lexington/Wunsche Loop Blvd 292P Planned improvements include upgrading Spring Cypress Road from a 4-lane asphalt roadway to a 5-lane concrete pavement within a 100-foot right of way including appropriate drainage accommodations. Project is nearing completion of the engineering design phase and our goal is to publish the project for bidding purposes the second quarter of 2014. (Last Updated On 4/16/2014)
Spring Stuebner Rd - B Rhodes Rd Falvel Rd 291J Proposed improvements include widening the existing 2-lane asphalt pavement to a 4-lane concrete pavement with 14-foot wide medians, drainage mitigation, traffic signals or traffic signal modifications. The Project was awarded to Menade, Inc. and construction commenced on September 10, 2013. Completion of the roadway project is scheduled for April 7, 2014 [barring any unforeseen circumstances beyond the Contractor's control]. (Last Updated On 4/16/2014)
Spring Stuebner Rd - C Falvel Rd I45 291Q Proposed improvements include widening the existing 2-lane asphalt pavement to a 4-lane concrete pavement with 14-foot wide medians, drainage mitigation, traffic signals or traffic signal modifications. The Project was awarded to SER and a Notice to Proceed date was given January 2014. Completion of the roadway project is scheduled for December 2014 [barring unforeseen circumstances beyond the Contractor's control, i.e, excessive inclement weather during the course of the contract.] (Last Updated On 4/16/2014)
T C Jester Blvd FM 1960 FM 2920 331T The necessary traffic engineering investigations have been accomplished to warrant the installation of ten traffic signal systems on T. C. Jester Boulevard between FM 1960 and FM 2920. Intersections to be signalized include T. C. Jester at 1) Chapel Bend Drive 2) Aspen Bend Drive 3) Kennonview Drive 4) Glenmere Lane 5) Winding Ridge Drive 6) Center Court Drive 7) Pinelakes Boulevard 8) Alvin A. Klein Drive 9) Springbrook Hollow Drive, and 10) Spring Creek Oaks Drive. Project is in the construction phase. (Last Updated On 4/16/2014)
Timber Forest Dr at Flax Bourton St 337W The necessary traffic engineering investigations have been accomplished to warrant the installation of a traffic signal system on Timber Forest Drive at Flax Bourton Drive. Project is currently in the Design Phase (Last Updated On 4/16/2014)
Treaschwig Segment A Rd Aldine Westfield Rd Birnam Wood Blvd 334A Proposed improvements include upgrading the existing 2-lane asphalt roadway to a 4-lane concrete pavement section with appropriate drainage system and all appurtenances necessary for realizing a complete project. Project is currently in the Study phase. (Last Updated On 4/16/2014)
Treaschwig Segment B Rd Birnam Wood Blvd Cypresswood Dr 333H 333D 334A Proposed improvements include upgrading the existing 2-lane asphalt roadway to a 4-lane concrete pavement section with appropriate drainage system and all appurtenances necessary for realizing a complete project. Project is currently in the Study phase. (Last Updated On 4/16/2014)
West Greens Rd - A East of SH 249 Cutten Rd 370K Proposed 4-lane concrete boulevard, including storm sewer system, drainage outfall and bridge over the BNRR tracks. The planned improvements are a joint participation effort between Harris County, TxDOT and the City of Houston. TxDOT awarded the Project to Texas Sterling Construction, L.P. and the improvements are scheduled for completion in August 2014. (Last Updated On 4/16/2014)
West Little York Rd at River Bottom Rd 406V The necessary traffic engineering investigations have been accomplished to warrant the installation of a traffic signal system on West Little York Road at River Bottom Road. The Project was awarded to Statewide Traffic and Notice to Proceed was given February 2014. Completion of the project is scheduled for March 28, 2014. (Last Updated On 4/16/2014)
Wilson Rd at Canyon Village Trace Dr 376S The necessary traffic engineering investigations have been accomplished to warrant the installation of a traffic signal system on Wilson Road at Canyon Village Trace Drive including southbound left turn lane on Wilson Road. Project is currently in the Design Phase. (Last Updated On 4/16/2014)