A complete listing of Capital Improvement Projects.

Project Name Limit From Limit To Keymap Internet Notes
Atascocita Rd at Atasca Oaks Dr 337X TS&II 2007 Package VI includes (4) intersections: 1) Atascocita Road at Will Clayton - dual left turn lanes 2) Atascocita at Atascocita Meadows - eastbound left turn lane 3) Atascocita at Atasca Oaks Drive - southbound left turn lane and traffic signalization 4) West Little York at Guhn Road - intersection improvements (Last Updated On 8/19/2009)
Atascocita Rd at Atascocita Meadows Dr 376D TS&II 2007 Package VI includes (4) intersections: 1) Atascocita Road at Will Clayton - dual left turn lanes 2) Atascocita at Atascocita Meadows - eastbound left turn lane 3) Atascocita at Atasca Oaks Drive - southbound left turn lane and traffic signalization 4) West Little York at Guhn Road - intersection improvements (Last Updated On 8/19/2009)
Birnamwood Dr Cypresswood Dr Spring Creek Dr 293U Proposed improvements include installation of a 4-lane concrete boulevard section, storm sewer system, drainage mitigation, traffic control devices as warranted and all appurtenances necessary for realizing a complete project within a 100-foot right of way. Project is currently in the study report phase. (Last Updated On 8/19/2009)
Boudreaux Rd 2500 ft W of S Hwy 249 3500 ft E of S Hwy 249 328A Extension and realignment including construction of transitions to ultimate intersection. Construction is contingent on installation of TxDOT's SH 249 main lane improvements that have been indefinitely delayed, by TxDOT. (Last Updated On 8/12/2009)
Champion Forest Spring Cypress Rd Boudreaux Rd 329H Proposed improvements include upgrading the existing half-boulevard to a 4-lane concrete boulevard section including installation of traffic signal systems as warranted. Project is currently in the preliminary engineering phase. (Last Updated On 8/17/2009)
Cypresswood Dr Homestead Pass Dr James C. Leo Dr 293U The Cypresswood Drive sidewalk improvements are currently in the engineering design phase. (Last Updated On 8/17/2009)
East Richey Rd East Hardy Rd Aldine Westfield Rd 333W 333T 333U Proposed improvements include combination 4-lane concrete boulevard section and 5-lane concrete pavement section with storm sewer system. Project is currently in the engineering design phase. (Last Updated On 8/17/2009)
Ella Blvd Spring Cypress Rd Falvel Rd 291Y Proposed widening to a 4-lane boulevard section including the installation of missing sidewalk segments on the east and west side of Ella Boulevard between Spring Cypress Road and Falvel Road. Project was awarded to R. Hassel & Company and is currently in the construction phase. Construction activity commenced September 8, 2009 and is scheduled for construction completion by February 5, 2010. (Last Updated On 9/16/2009)
Ella Blvd - 1 Gears Rd Rushcreek Dr 372K Proposed installation of a 4-lane concrete boulevard section with storm sewer system including bridge over Greens Bayou. Project is currently in the engineering design phase and our goal is to request Commissioners' Court authoriztion to bid this project on September 15, 2009. (Last Updated On 8/17/2009)
Ella Blvd - A Louetta Rd Spring Cypress Rd 291Y Proposed widening to a 4-lane boulevard section including the northbound bridge over Seals Gully and installation of sidewalks on the east side of Ella Blvd between Sapling Trail and Spring Cypress Road. Project is currently in the engineering design phase and our goal is to bid this project in the 4th quarter of 2009. (Last Updated On 9/14/2009)
Fallbrook Dr - A Old Bammel N Houston Rd Antoine Dr 371W Installation of a 4 lane concrete boulevard section, storm sewer system, drainage mitigation, sidewalk improvements and traffic signals or traffic signal modifications. Project is in the engineering design phase. (Last Updated On 8/17/2009)
Fallbrook Dr - B Antoine Dr E of Halls Bayou 411B Widen to a 4-lane concrete boulevard section, with a bridge over Halls Bayou, storm sewer system, sidewalks on the north side of Fallbrook Drive and traffic control devices as warranted. Project is in the engineering design phase. (Last Updated On 8/17/2009)
Fallbrook Dr - C East of Halls Bayou Veterans Memorial Dr 411C Widen to a 4-lane concrete boulevard section, with storm sewer system, sidewalks on the north side of Fallbrook Drive and modifications to the existing pedestrian signal system. Project is in the engineering design phase. (Last Updated On 8/17/2009)
Falvel Rd - 1 Ella Blvd FM 2920 291U Proposed upgrade from the 2-lane asphalt roadway to a 4-lane concrete boulevard section including the appropriate traffic signal modifications and intersection improvements at FM 2920. Project is currently in the engineering design phase. (Last Updated On 8/17/2009)
Falvel Rd - 2 FM 2920 Spring Stuebner 291Q Proposed widening to a 4-lane concrete pavement with appropriate drainage system. Project is currently in the engineering design phase. (Last Updated On 8/17/2009)
FM 2100-Huffman New Caney Wolf Rd FM 1485 259N Pursue alignment study and right of way mapping for ultimate 150-foot right of way. Project is currently in the study phase. (Last Updated On 8/19/2009)
Gosling Rd Kuykendahl Rd FM 2920 290V 290R Proposed 2-lane asphalt roadway with combination storm sewer/ditch improvements between Kuykendahl Road and FM 2920. Joint participation project between Harris County and TxDOT. TxDOT let (bid) project on July 7, 2009. Final award and notice to proceed pending. (Last Updated On 8/17/2009)
Grand Pkwy - F1 and F2 IH 10 US 59 445T Proposed 4-lane divided roadway also known as SH 99. Managed by The Grand Parkway Association (GPA). For additional information contact GPA, at (713) 965-0871. (Last Updated On 8/17/2009)
Hollister Rd - 1 Beltway 8 W Greens Rd 370V Installation of a 4-lane concrete boulevard section with storm sewer system and offsite storm water detention. Project was awarded to Beyer Construction and is currently in the construction phase. Construction activity commenced September 21, 2009 and is scheduled for construction completion by July 17, 2010. (Last Updated On 9/16/2009)
Hollister Rd - 2 W Greens Rd Bourgeois Rd 370M Installation of a 4-lane concrete boulevard section with storm sewer system, traffic signalization on Hollister at Bourgeois and offsite storm water detention. Project was awarded to Beyer Construction and is currently in the construction phase. Construction activity commenced September 21, 2009 and is scheduled for construction completion by July 17, 2010. (Last Updated On 9/16/2009)
Hollister Rd - 3 Bourgeois Rd FM 1960 370G Proposed 4-lane concrete boulevard section with storm sewer system and offsite storm water detention. Project is currently in the preliminary engineering phase. (Last Updated On 8/17/2009)
Holzwarth Rd Meadow Edge Ln Spring Cypress Rd 292X Proposed improvements include extending Holzwarth Road as 4-lane asphalt pavement within a 100' right of way including drainage mitigation, traffic signalization, signal modifications and fiber optic interconnect. Project is currently in the preliminary engineering phase. (Last Updated On 8/17/2009)
Hufsmith-Kohrville Rd Spring Cypress Rd FM 2920 329P 289E Proposed alignment study and report for developing alignment options identifying the existing and projected land uses including existing drainage conditions, future drainage needs and right of way requirements for the recommended typical section. (Last Updated On 6/15/2009)
Imperial Valley Dr - A N of Rankin Rd 125' NW Remington Heights Dr 372H Proposed improvements include installation of the remaining half boulevard section. Project is currently in the preliminary engineering phase. (Last Updated On 8/10/2009)
Imperial Valley Dr - B 125 NW of Remington Heigh Dr Airtex Dr 372D Proposed improvements include the installation of a 4-lane concrete boulevard section, storm sewer system, drainage mitigation and traffic control devices as warranted. Project is currently in the preliminary engineering phase. (Last Updated On 8/17/2009)
Jones Rd - A SH 290 FM 529 409P Proposed installation of 4-lane concrete boulevard section with storm sewer system, detention, railroad crossing and traffic signalization from US 290 to FM 529. Project is currently in the engineering design phase. (Last Updated On 8/17/2009)
Kuykendahl Rd - A FM 2920 Willow Creek 290R Widen from a 2-lane asphalt roadway to a 4-lane asphalt pavement with continuous left turn lane, combination roadside ditches and storm sewer system, bridge over Willow Creek, drainage mitigation and traffic signal modifications. Project is currently in the engineering design phase. (Last Updated On 8/17/2009)
Kuykendahl Rd - B Willow Creek Augusta Pines Dr 290A Widen existing 2-lane asphalt roadway to a 4-lane asphalt pavement with continuous left turn lane, combination roadside ditches and storm sewer system, traffic signal at Hufsmith Road and traffic signal modifications. Project is currently in the engineering design phase and is expected to bid in the 1st quarter of 2010. (Last Updated On 9/14/2009)
Kuykendahl Rd - C Augusta Pines Dr Spring Creek Dr 250S Upgrade the existing 2-lane asphalt roadway to a combination 2-lane and 4-lane concrete pavement, treed medians, 4-foot unimproved shoulders with open ditches within a 160-foot right of way. This is a joint participation project between Harris County Precinct 4 and The Woodlands Road Utility District No.1. Harris County will pursue utility relocations and fund 100% of the construction cost. The Woodlands Road Utility District No.1 has agreed to provide engineering design which is currently in progress. (Last Updated On 8/17/2009)
Kuykendahl Rd at Louetta Rd 331B Project improvements include the deployment of a Changeable Lane Assignment Signal System (CLASS) at the intersection of Kuykendahl Road at Louetta Road. CLASS provides the ability to integrate operations between the traffic signal control system and the CLASS application allowing lane assignments to change with the traffic patterns. Additional improvements include right turn lanes and intersection management. Construction activity commenced on February 16, 2009 and is scheduled for completion on October 29, 2009. (Last Updated On 8/17/2009)
Lee Rd at FM 1960 334V Proposed improvements include upgrading the Lee Road at FM 1960 intersection to two-concrete travel lanes in each direction including the southbound turn lane transition and associated storage bay. Currently in the engineering design phase. (Last Updated On 8/17/2009)
North Eldridge Pkwy W Little York Rd FM 529 408Z Proposed improvements include installation of a continuous turn lane, appropriate drainage conveyance system, incorporation of dual northbound/southbound left turn lanes on North Eldridge Parkway at FM 529, traffic signal and fiber optic interconnect modifications. Project is currently in the preliminary engineering phase. (Last Updated On 8/10/2009)
North Eldridge Pkwy at Crossroads Park Dr 408D TS&II - 2007 Package V includes (4) intersections: 1. North Eldridge Parkway @ Crossroads Park Drive 2. Spring Cypress Road @ Louetta Road 3. Spring Cypress Road @ Village Creek Trail 4. West Little York Road @ Evergreen Trails/Enclave Vista Drive Construction activity commenced August 7, 2009 and project is scheduled for completion December 6, 2009. (Last Updated On 8/19/2009)
North Eldridge Pkwy at West Little York Rd 408Z Project improvements include the deployment of a Changeable Lane Assignment Signal System (CLASS) at the intersection of North Eldridge Parkway and West Little York Road. CLASS provides the ability to integrate operations between the traffic signal control system and the CLASS application allowing lane assignments to change with the traffic patterns. Additional improvements include right turn lanes and intersection management. Construction activity commenced on February 16, 2009 and is scheduled for completion on October 29, 2009. (Last Updated On 8/17/2009)
Perry Rd - A FM 1960 North of Mills Rd 369Q Proposed improvements include widening from an existing 2-lane asphalt pavement with roadside ditches to a 4-lane concrete boulevard section with storm sewer system, offsite detention, and signalization at Lou Edd Road and Mills Road intersections. Requested Commissioners' Court authorization to bid on July 28, 2009; the bid and subsequent award process requires 90 to 120 days to accomplish. (Last Updated On 8/17/2009)
Perry Rd - B Mills Rd SH 249 369L Proposed improvements include widening from an existing 2-lane asphalt pavement with roadside ditches to a 4-lane concrete boulevard section with storm sewer system, offsite detention. Project is in the engineering design phase. (Last Updated On 8/17/2009)
Red Oak Dr FM 1960 Drava Ln 332J Proposed improvements include upgrading the existing 2-lane asphalt roadway to a 3 or 4-lane concrete roadway with storm sewer system within a 60 foot right of way. Project is currently in the preliminary engineering phase. (Last Updated On 8/17/2009)
Spring Cypress Rd - A Telge Rd Faulkey Gully 327Z Proposed improvements include widening the existing 2-lane asphalt roadway to a 4-lane concrete boulevard section with storm sewer system, drainage mitigation and traffic signal modifications. Project is currently in the preliminary engineering phase. (Last Updated On 8/17/2009)
Spring Cypress Rd - B Faulkey Gully SH 249 328Q Proposed improvements include widening the existing 2-lane asphalt roadway to a 4-lane concrete boulevard section with storm sewer system, drainage mitigation and traffic signal modifications. Project is currently in the preliminary engineering phase. (Last Updated On 8/17/2009)
Spring Cypress Rd at Louetta Rd 328S TS&II - 2007 Package V includes (4) intersections: 1. North Eldridge Parkway @ Crossroads Park Drive 2. Spring Cypress Road @ Louetta Road 3. Spring Cypress Road @ Village Creek Trail 4. West Little York Road @ Evergreen Trails/Enclave Vista Drive Construction activity commenced August 7, 2009 and project is scheduled for completion December 6, 2009. (Last Updated On 8/19/2009)
Spring Cypress Rd at Village Creek Trail 328Q TS&II - 2007 Package V includes (4) intersections: 1. North Eldridge Parkway @ Crossroads Park Drive 2. Spring Cypress Road @ Louetta Road 3. Spring Cypress Road @ Village Creek Trail 4. West Little York Road @ Evergreen Trails/Enclave Vista Drive Construction activity commenced August 7, 2009 and project is scheduled for completion December 6, 2009. (Last Updated On 8/19/2009)
Spring Stuebner Rd - A Kuykendahl Rd Rhodes Rd 290L Proposed improvements include widening the existing 2-lane asphalt pavement to a 4-lane concrete boulevard with storm sewer system, drainage mitigation, traffic signals or traffic signal modifications. Project is currently in the preliminary engineering phase. (Last Updated On 8/17/2009)
Spring Stuebner Rd - B Rhodes Rd Falvel Rd 291J Proposed improvements include widening the existing 2-lane asphalt pavement to a 4-lane concrete boulevard with storm sewer system, drainage mitigation, traffic signals or traffic signal modifications. Project is currently in the preliminary engineering phase. (Last Updated On 8/17/2009)
Spring Stuebner Rd - C Falvel Rd I45 291Q Proposed improvements include widening the existing 2-lane asphalt pavement to a 4-lane concrete boulevard with storm sewer system, drainage mitigation, traffic signals or traffic signal modifications. Project is currently in the preliminary engineering phase. (Last Updated On 8/17/2009)
Stuebner Airline Rd - A Spring Cypress Rd Thora Ln 330B Proposed improvements including upgrading from a 2-lane asphalt pavement to a 5-lane concrete boulevard section, drainage mitigation with combination storm sewer system and swale ditch. Project is currently in preliminary engineering phase. (Last Updated On 8/17/2009)
Stuebner Airline Rd - B Thora Ln FM 2920 290W Proposed improvements including upgrading from a 2-lane asphalt pavement to a 5-lane concrete boulevard section, drainage mitigation with combination storm sewer system and swale ditch. Project is currently in preliminary engineering phase. (Last Updated On 8/17/2009)
Tanner Rd Triway Ln Beltway 8 449D Proposed improvements include widening from a 2-lane asphalt to a 4-lane concrete boulevard with storm sewer improvements within a 100 foot right of way. This is a joint participation project with the City of Houston and TXDOT. (Last Updated On 8/17/2009)
TC Jester Blvd - A N of Spears Rd FM 1960 371C Proposed installation of a 4-lane concrete boulevard section with storm sewer system and offsite detention. Project is currently in the preliminary engineering phase. (Last Updated On 8/17/2009)
TC Jester Blvd - C1 Center Ct Dr Spring Cypress Rd 330D Extension of the existing boulevard section between Center Court Drive and Spring Cypress Road, realignment of Klein Cemetery Road including a traffic signal system on T.C. Jester Boulevard at Spring Cypress Road. Construction activity commenced on March 9, 2009 and is currently scheduled for completion on February 13, 2010. (Last Updated On 8/17/2009)
Tomball Outfall Ditch Graham Dr Barbara St 288L Proposed installation of a box culvert system and extreme event swales capable of conveying a 100 year rainfall event. Project was bid and will be managed by Harris County Flood Control District (HCFCD) in conjunction with HCFCD's M125 midreach and downstream improvements. Construction for this project began on June 22, 2009 and is scheduled to be complete by February 17, 2010. (Last Updated On 9/14/2009)
Treaschwig Rd at Banquo Dr 333D TS&II 2007 Package IV includes (2) intersections: 1) Treaschwig at Banquo - traffic signal and intersection improvements 2) Will Clayton at Woodland Hills Drive - traffic signalization Construction activity commenced on May 26, 2009 and the Project is scheduled for completion by September 23, 2009. (Last Updated On 8/19/2009)
West Greens Rd - A B SH 249 Hollister Dr 370R Proposed 4-lane concrete boulevard, including storm sewer system, drainage outfall, storm water detention, bridge over Greens Bayou and BNRR track. Project is being designed and will be constructed in two segments; A) from east of SH 249 to Cutten Road and B) from Cutten Road to Hollister Road. Segment A is in the preliminary engineering phase and Segment B is in the engineering design phase. (Last Updated On 8/17/2009)
West Little York Rd at Enclave Vista / Evergreen 410W TS&II - 2007 Package V includes (4) intersections: 1. North Eldridge Parkway @ Crossroads Park Drive 2. Spring Cypress Road @ Louetta Road 3. Spring Cypress Road @ Village Creek Trail 4. West Little York Road @ Evergreen Trails/Enclave Vista Drive Construction activity commenced August 7, 2009 and project is scheduled for completion December 6, 2009. (Last Updated On 8/19/2009)
West Little York Rd at Guhn Rd 410Y TS&II 2007 Package VI includes (4) intersections: 1) Atascocita Road at Will Clayton - dual left turn lanes 2) Atascocita at Atascocita Meadows - eastbound left turn lane 3) Atascocita at Atasca Oaks Drive - southbound left turn lane and traffic signalization 4) West Little York at Guhn Road - intersection improvements (Last Updated On 8/19/2009)
West Rd Old Meadow Ln Blacksmith Dr 410G Proposed installation of a 4-foot wide sidewalk on the south side of West Road between Old Meadow Lane and Blacksmith Drive. Project is currently in the engineering design phase. (Last Updated On 8/17/2009)
Will Clayton Pkwy - A US 59 S Houston Ave 375C Proposed 5-lane asphalt pavement (2-lanes in each direction with a continuous turn lane) including a new bridge structure over the railroad tracks to accommodate westbound traffic. Project is currently in the engineering design phase and our goal is to bid this segment in the 2nd quarter of 2010. (Last Updated On 9/14/2009)
Will Clayton Pkwy - B S Houston Ave Wilson Rd 375D Proposed 5-lane (2-lanes in each direction with a continuous turn lane) asphalt pavement. Project is currently in the engineering design phase and our goal is to request authorization to bid this segment in the 4th quarter 2009. (Last Updated On 8/17/2009)
Will Clayton Pkwy at Atascocita Rd 376G TS&II 2007 Package VI includes (4) intersections: 1) Atascocita Road at Will Clayton - dual left turn lanes 2) Atascocita at Atascocita Meadows - eastbound left turn lane 3) Atascocita at Atasca Oaks Drive - southbound left turn lane and traffic signalization 4) West Little York at Guhn Road - intersection improvements (Last Updated On 8/19/2009)
Will Clayton Pkwy at Woodland Hills Dr 376D TS&II 2007 Package IV includes (4) intersections: 1) Treaschwig at Banquo - traffic signal and eastbound left turn lane 2) Will Clayton at Woodland Hills - traffic signalization Construction activity commenced on May 26, 2009 and the Project is scheduled for completion by September 23, 2009. (Last Updated On 8/19/2009)
Woodland Hills Dr Woodland Path Dr Will Clayton Pkwy 376M Proposed improvements include widening to a 4-lane concrete boulevard section. Project is currently in the preliminary engineering phase. (Last Updated On 8/17/2009)