A complete listing of Capital Improvement Projects.
| Project Name | Limit From | Limit To | Keymap | Internet Notes |
|---|---|---|---|---|
| Atascocita Rd at Atasca Oaks Dr | 337X | TS&II 2007 Package VI includes (4) intersections: 1) Atascocita at Atasca Oaks Drive, 2) Atascocita at Atascocita Meadows, 3) Will Clayton Parkway at Atascocita and 4) West Little York at Guhn Road. Project was awarded to Durwood Greene on February 23, 2010, construction efforts commenced on May 11, 2010 and construction completion is expected by September 7, 2010. (Last Updated On 6/29/2010) | ||
| Atascocita Rd at Atascocita Meadows Dr | 376D | TS&II 2007 Package VI includes (4) intersections: 1) Atascocita at Atascocita Meadows, 2) Atascocita at Atasca Oaks Drive, 3) Will Clayton Parkway at Atascocita and 4) West Little York at Guhn Road. Project was awarded to Durwood Greene on February 23, 2010, construction efforts commenced on May 11, 2010 and construction completion is expected by September 7, 2010. (Last Updated On 6/29/2010) | ||
| Birnamwood Dr | North of Cypresswood Dr | Spring Creek Dr | 293T 293P | Proposed improvements include installation of a 4-lane concrete boulevard section, storm sewer system, drainage mitigation, traffic control devices as warranted and all appurtenances necessary for realizing a complete project within a 100-foot right of way. Project is currently in the engineering design phase. (Last Updated On 7/7/2010) |
| Boudreaux Rd | 2500 ft W of S Hwy 249 | 3500 ft E of S Hwy 249 | 328C 328D 288Z | Extension and realignment including construction of transitions to ultimate intersection. Construction is contingent on installation of TxDOT's SH 249 main lane improvements that have been indefinitely delayed, by TxDOT. (Last Updated On 8/12/2009) |
| Champion Forest | Spring Cypress Rd | Boudreaux Rd | 329H | Proposed improvements include upgrading the existing half-boulevard section to a 4-lane concrete boulevard including installation of traffic signal systems as warranted. Project is currently in the engineering design phase and our goal is to request Commissioners' Court authorization to bid in the 4th quarter of 2010. (Last Updated On 6/29/2010) |
| Cypresswood Dr | Homestead Pass Dr | James C. Leo Dr | 293U | Harris County requested authorization to bid the Cypresswood Drive sidewalk improvements project on June 8, 2010. The Project was awarded to Tejas USA Builders, LLC on July 13, 2010. A pre-construction meeting will be scheduled and a construction commencement date will be identified upon successful completion of the Award Phase. (Last Updated On 7/20/2010) |
| East Richey Rd | East Hardy Rd | Aldine Westfield Rd | 333W 333T 333U | Proposed improvements include combination 4-lane concrete boulevard section or 5-lane concrete pavement section with storm sewer system. Harris County requested Commissioners' Court authorization to bid on May 11, 2010. The Bid and subsequent Award phase takes approximately 90-120 to accomplish; construction efforts will commence upon successful completion of the Award phase. (Last Updated On 5/11/2010) |
| Ella Blvd - 1 | Gears Rd | Rushcreek Dr | 372K | Installation of a 4-lane concrete boulevard section with storm sewer system including bridge over Greens Bayou. Project was awarded to Conrad Construction. Construction activity commenced January 11, 2010 and the planned improvements are scheduled for completion by January 12, 2011. (Last Updated On 4/23/2010) |
| Ella Blvd - A | Louetta Rd | Spring Cypress Rd | 291Y | Proposed widening to a 4-lane boulevard section including the northbound bridge over Seals Gully and installation of sidewalks on the east side of Ella Boulevard between Sapling Trail and Spring Cypress Road. Project was awarded to Menade, Inc. Construction activity commenced June 1, 2010 and the planned improvements are scheduled for completion by October 28, 2010. (Last Updated On 6/29/2010) |
| Ella Blvd - B | Spring Cypress Rd | Falvel Rd | 291Y | Proposed widening to a 4-lane boulevard section. Project was awarded to R. Hassel & Company and is currently in the construction phase. Construction activity commenced September 8, 2009 and is scheduled for construction completion by July 20, 2010. (Last Updated On 4/21/2010) |
| Fallbrook Dr | Ann Louise Rd | Veterans Memorial Dr | 411C | Planned improvements include widening the half- boulevard to a 4-lane concrete boulevard section, with storm sewer system, sidewalks on the north side of Fallbrook Drive and upgrading the existing pedestrian signal to a traffic signal system with pedestrian signals. Harris County requested Commissioners' Court authorization to bid on July 13, 2010. The Bid and subsequent Award phase takes approximately 90-120 to accomplish; construction efforts will commence upon successful completion of the Award phase. (Last Updated On 7/20/2010) |
| Fallbrook Dr - A | Old Bammel N Houston Rd | Antoine Dr | 371W | Installation of a 4 lane concrete boulevard section, storm sewer system, drainage mitigation, sidewalk improvements and traffic signals or traffic signal modifications. Project was awarded to Menade, Inc. on June 22, 2010. A pre-construction meeting will be scheduled and a construction commencement date will be identified upon successful completion of the Award Phase. (Last Updated On 6/29/2010) |
| Fallbrook Dr - B | Antoine Dr | E of Halls Bayou | 411B | Widen to a 4-lane concrete boulevard section, with a bridge over Halls Bayou, storm sewer system, sidewalks on the north side of Fallbrook Drive and traffic control devices as warranted. Project is in the engineering design phase and our goal is to request Commissioner's Court authorization to bid the project in the 2nd quarter of 2011. (Last Updated On 6/29/2010) |
| Falvel Rd - 1 | Ella Blvd | FM 2920 | 291U | Proposed upgrade from the 2-lane asphalt roadway to a 4-lane concrete boulevard section including the appropriate traffic signal modifications and intersection improvements at FM 2920. Project was awarded to Mar-Con Services, LLC on July 13, 2010. A pre-construction meeting will be scheduled and a construction commencement date will be identified upon successful completion of the Award Phase. (Last Updated On 7/20/2010) |
| Falvel Rd - 2 | FM 2920 | Spring Stuebner | 291Q | Proposed widening to a 4-lane concrete pavement with appropriate drainage system. Project is currently in the engineering design phase and our goal is to request Commissioners' Court authorization to bid this project on August 10, 2010. (Last Updated On 7/7/2010) |
| FM 2100-Huffman New Caney | Wolf Rd | FM 1485 | 259N | Pursue alignment study and right of way mapping for ultimate 150-foot right of way. Project is currently in the study phase. (Last Updated On 8/19/2009) |
| Gosling Rd | Kuykendahl Rd | FM 2920 | 290V 290R | Proposed 2-lane asphalt roadway with combination storm sewer/ditch improvements between Kuykendahl Road and FM 2920. Joint participation project between Harris County and TxDOT. TxDOT is managing the construction activity that commenced on October 14, 2009. Construction completion is expected by July 1, 2010 (barring any challenges beyond the Contractor's control, e.g., additional inclement weather days). (Last Updated On 6/29/2010) |
| Grand Pkwy - F1 and F2 | US 290 | IH 45 | 445T | Proposed 4-lane divided roadway also known as SH 99. Project development is currently being managed by the Harris County Toll Road Authority (HCTRA). For additional information contact HCTRA at (713) 601-7800. (Last Updated On 8/3/2010) |
| Hollister Rd - 1 | Beltway 8 | W Greens Rd | 370V | Hollister Road, between Beltway 8 and Bourgeois Road, included the installation of a 4-lane concrete boulevard section with storm sewer system, drainage mitigation, a bridge structure over Greens Bayou, traffic signal modifications on Hollister Road at Beltway 8, and a traffic signal systems on Hollister Road at Bourgeois Road and Brittney Park Drive. The $4,541,699, construction contract was awarded to Beyer Construction on August 29, 2009 and construction activity commenced on September 21, 2009. The project was deemed complete on July 14, 2010, three months ahead of the contract completion date. (Last Updated On 7/14/2010) |
| Hollister Rd - 2 | W Greens Rd | Bourgeois Rd | 370M | Hollister Road, between Beltway 8 and Bourgeois Road, included the installation of a 4-lane concrete boulevard section with storm sewer system, drainage mitigation, a bridge structure over Greens Bayou, traffic signal modifications on Hollister Road at Beltway 8, and a traffic signal systems on Hollister Road at Bourgeois Road and Brittney Park Drive. The $4,541,699, construction contract was awarded to Beyer Construction on August 29, 2009 and construction activity commenced on September 21, 2009. The project was deemed complete on July 14, 2010, three months ahead of the contract completion date. (Last Updated On 7/14/2010) |
| Hollister Rd - 3 | Bourgeois Rd | FM 1960 | 370G | Proposed extension of a 4-lane concrete boulevard section, from north of Bourgois Road to FM 1960 along Duncan Road, including installation of a storm sewer system and offsite storm water detention. Project is currently in the engineering design phase and our goal is to obtain Commissioners' Court approval to bid the improvements in the first quarter of 2011. (Last Updated On 7/20/2010) |
| Holzwarth Rd | Meadow Edge Ln | FM 2920 | 292S | Proposed improvements include extending Holzwarth Road as 4-lane asphalt pavement within a 100' right of way including drainage mitigation, traffic signalization, signal modifications and fiber optic interconnect. Project is currently in the preliminary engineering phase. (Last Updated On 8/17/2009) |
| Hufsmith-Kohrville Rd | Spring Cypress Rd | FM 2920 | 329P 289E | Proposed alignment study and report for developing alignment options identifying the existing and projected land uses including existing drainage conditions, future drainage needs and right of way requirements for the recommended typical section. (Last Updated On 6/15/2009) |
| Imperial Valley Dr - A | N of Rankin Rd | 125' NW Remington Heights Dr | 372H | Proposed improvements include installation of the remaining half boulevard section. Project is currently in the engineering design phase and our goal is to request Commissioners' Court authorization to bid this project on August 24, 2010. The bid phase and subsequent award process requires 90-120 days to accomplish. (Last Updated On 8/19/2010) |
| Imperial Valley Dr - B | Remington Heights Dr | Airtex Dr | 372D | Proposed improvements include the installation of a 4-lane concrete boulevard section, storm sewer system, drainage mitigation and traffic control devices as warranted. Project is currently in the engineering design phase and our goal is to request Commissioners' Court authorization to bid this section of Imperial Valley Drive in the 1st Quarter of 2011. (Last Updated On 6/29/2010) |
| Jones Rd - A | SH 290 | FM 529 | 409P | Joint participation project between Harris County and the City of Jersey Village. Planned improvements include the installation of 4-lane concrete boulevard section with storm sewer system, detention, railroad crossing and traffic signalization at US 290 and FM 529. The City of Jersey Village awarded the construction contract to Pace Services in the amount of $4,031,759. Construction activity commenced July 19, 2010 and is scheduled for construction completion by July 19, 2011. (Last Updated On 7/20/2010) |
| Kuykendahl Rd - A | FM 2920 | Willow Creek | 290R | Widen from a 2-lane asphalt roadway to a 4-lane asphalt pavement with continuous left turn lane, combination roadside ditches and storm sewer system, bridge over Willow Creek, drainage mitigation and traffic signal modifications. Commissioners’ Court Awarded the project construction contract to Angel Brothers Enterprises, Ltd. on July 13, 2010. A pre-construction meeting will be scheduled and a construction commencement date will be identified upon successful completion of the Award Phase. (Last Updated On 7/14/2010) |
| Kuykendahl Rd - B | Willow Creek | Augusta Pines Dr | 290A | Widen existing 2-lane asphalt roadway to a 4-lane asphalt pavement with continuous left turn lane, combination roadside ditches and storm sewer system, traffic signal at Hufsmith Road and traffic signal modifications. Commissioners’ Court awarded the project construction contract to Angel Brothers Enterprises, Ltd. on June 8, 2010. A pre-construction meeting will be scheduled and a construction commencement date will be identified upon successful completion of the Award Phase. (Last Updated On 7/14/2010) |
| Kuykendahl Rd - C | Augusta Pines Dr | Spring Creek Dr | 250S | Upgrade the existing 2-lane asphalt roadway to a combination 2-lane or 4-lane concrete pavement, treed medians, 4-foot unimproved shoulders with open ditches within a 160-foot right of way. This is a joint participation project between Harris County Precinct 4 and The Woodlands Road Utility District No.1. Harris County will fund $5.8 million of the construction cost. The Woodlands Road Utility District No.1 has agreed to provide engineering design and and fund construction costs exceeding Precinct 4's committment. Final design efforts are currently in progress and Harris County expects to obtain Commissioners' Court approval to bid the improvements in the 3rd quarter of 2010. (Last Updated On 7/14/2010) |
| Kuykendahl Rd at Louetta Rd | 331B | Intersection improvements (right turn lanes and modified left turn lanes) were completed on October 29, 2009. Additional improvements will include the deployment of a Changeable Lane Assignment Signal System (CLASS) at the intersection of Kuykendahl Road at Louetta Road. CLASS provides the ability to integrate operations between the traffic signal control system and the CLASS application allowing lane assignments to change with the traffic patterns for better intersection management. The CLASS installation is expected to begin in 2010. (Last Updated On 6/29/2010) | ||
| Lee Rd at FM 1960 | 334V | Improvements include upgrading the Lee Road at FM 1960 intersection to a 48-foot wide concrete pavement with storm sewer system, turn lane transitions and associated storage bays within an 80-foot right of way. Currently in the engineering design phase. (Last Updated On 4/23/2010) | ||
| North Eldridge Pkwy | W Little York Rd | FM 529 | 408Z | Proposed improvements include installation of a continuous turn lane, appropriate drainage conveyance system, incorporation of dual northbound/southbound left turn lanes on North Eldridge Parkway at FM 529, including traffic signal and fiber optic interconnect modifications. Project was awarded to Durwood Greene Construction Co. on July 13, 2010. A pre-construction meeting will be scheduled and a construction commencement date will be identified upon successful completion of the Award Phase. (Last Updated On 7/20/2010) |
| North Eldridge Pkwy at West Little York Rd | 408Z | Intersection improvements (right turn lanes and modified left turn lanes) were completed on October 29, 2009. Additional improvements will include the deployment of a Changeable Lane Assignment Signal System (CLASS) at the intersection of North Eldridge and West Little York. CLASS provides the ability to integrate operations between the traffic signal control system and the CLASS application allowing lane assignments to change with the traffic patterns for better intersection management. The CLASS installation is expected to begin in the second quarter of 2010. (Last Updated On 12/28/2009) | ||
| Perry Rd - A | FM 1960 | North of Mills Rd | 369Q | Proposed improvements include widening from an existing 2-lane asphalt pavement with roadside ditches to a 4-lane concrete boulevard section with storm sewer system, offsite detention, and signalization at Lou Edd Road and Mills Road intersections. Project was awarded to Menade, Inc. Construction activity commenced November 30, 2009 and the planned improvements are scheduled for completion by November 18, 2010. (Last Updated On 6/29/2010) |
| Perry Rd - B | Mills Rd | SH 249 | 369L | Proposed improvements include widening from an existing 2-lane asphalt pavement with roadside ditches to a 4-lane concrete boulevard section with storm sewer system and offsite detention. Project is currently in the engineering design phase and our goal is to request Commissioners' Court authorization to bid this project on August 24, 2010. (Last Updated On 7/7/2010) |
| Red Oak Dr | FM 1960 | Drava Ln | 332J | Proposed improvements include upgrading the existing 2-lane asphalt roadway to a combination 3-lane or 4-lane concrete roadway with storm sewer system within a 60-foot right of way. Project is currently in the engineering design phase and our goal is to request Commissioners' Court authorization to bid this project on July 13, 2010. (Last Updated On 5/14/2010) |
| Spring Cypress Rd - A | Telge Rd | Faulkey Gully | 327Z 328S | Proposed improvements include widening the existing 2-lane asphalt roadway to a 4-lane concrete boulevard section with storm sewer system, drainage mitigation and traffic signal modifications. Project is currently in the engineering design phase and our goal is to request Commissioners' Court authorization to bid in the 1st quarter of 2011. (Last Updated On 4/21/2010) |
| Spring Cypress Rd - B | Faulkey Gully | SH 249 | 328Q | Proposed improvements include widening the existing 2-lane asphalt roadway to a 4-lane concrete boulevard section with storm sewer system, drainage mitigation, bridge over Faulkey Gully and traffic signal modifications. Project is currently in the engineering design phase and our goal is to request Commissioners' Court authorization to bid this project in the 4th quarter of 2010. (Last Updated On 4/23/2010) |
| Spring Stuebner Rd - A | Kuykendahl Rd | Rhodes Rd | 290L | Proposed improvements include widening the existing 2-lane asphalt pavement to a 4-lane concrete boulevard with storm sewer system, drainage mitigation, traffic signals or traffic signal modifications. Project is currently in the preliminary engineering phase. (Last Updated On 8/17/2009) |
| Spring Stuebner Rd - B | Rhodes Rd | Falvel Rd | 291J | Proposed improvements include widening the existing 2-lane asphalt pavement to a 4-lane concrete boulevard with storm sewer system, drainage mitigation, traffic signals or traffic signal modifications. Project is currently in the preliminary engineering phase. (Last Updated On 8/17/2009) |
| Spring Stuebner Rd - C | Falvel Rd | I45 | 291Q | Proposed improvements include widening the existing 2-lane asphalt pavement to a 4-lane concrete boulevard with storm sewer system, drainage mitigation, traffic signals or traffic signal modifications. Project is currently in the preliminary engineering phase. (Last Updated On 8/17/2009) |
| Stuebner Airline Rd - A | Spring Cypress Rd | Thora Ln | 330B | Proposed improvements including upgrading from a 2-lane asphalt pavement to a 5-lane concrete pavement section, drainage mitigation with combination storm sewer system, swale ditch and detention. Project is currently in the engineering design phase. (Last Updated On 1/13/2010) |
| Stuebner Airline Rd - B | Thora Ln | FM 2920 | 290W | Proposed improvements including upgrading from a 2-lane asphalt pavement to a 5-lane concrete pavement section, drainage mitigation with combination storm sewer system, swale ditch and detention. Project is currently in engineering design phase. (Last Updated On 1/13/2010) |
| TC Jester Blvd - A | N of Spears Rd | FM 1960 | 371C | Proposed installation of a 4-lane concrete boulevard section with storm sewer system and offsite detention. Project is currently in the preliminary engineering phase. (Last Updated On 8/17/2009) |
| West Greens Rd - A B | SH 249 | Hollister Dr | 370R | Proposed 4-lane concrete boulevard, including storm sewer system, drainage outfall, storm water detention, bridge over Greens Bayou and BNRR track. Project is being designed and will be constructed in two segments; A) from east of SH 249 to Cutten Road and B) from Cutten Road to Hollister Road. Segment A is a joint participation project between Harris County, TxDOT and the City of Houston and is in the engineering design phase; the constructions plans will be transmitted to TxDOT for letting purposes in the 4th quarter of 2010. Segment B is in the engineering design phase and our goal is to request Commissioners' Court authorization to bid in the 3rd quarter of 2010. (Last Updated On 5/21/2010) |
| West Little York Rd at Guhn Rd | 410Y | TS&II 2007 Package VI includes (4) intersections: 1) West Little York at Guhn Road, 2) Atascocita at Atascocita Meadows, 3) Atascocita at Atasca Oaks Drive and 4) Will Clayton Parkway at Atascocita. Project was awarded to Durwood Greene on February 23, 2010, construction efforts commenced on May 11, 2010 and construction completion is expected by September 7, 2010. (Last Updated On 6/29/2010) | ||
| West Rd | Old Meadow Ln | Blacksmith Dr | 410G | Proposed installation of a 4-foot wide sidewalk on the south side of West Road between Old Meadow Lane and Blacksmith Drive. Commissioners’ Court awarded the project construction contract to Aranda Brothers Construction on July 13, 2010. A pre-construction meeting will be scheduled and a construction commencement date will be identified upon successful completion of the Award Phase. (Last Updated On 7/20/2010) |
| Will Clayton Pkwy - A | US 59 | S Houston Ave | 375C | Widen the existing 2-lane asphalt roadway to a 5-lane asphalt pavement (2-lanes in each direction with a continuous turn lane) including a new bridge structure over the railroad tracks to accommodate westbound traffic. Project was awarded to Rozco Contracting, Inc. on May 25, 2010. Construction activity is scheduled to commence July 26, 2010 and and construction completion realized by April 1, 2011. (Last Updated On 7/20/2010) |
| Will Clayton Pkwy - B | S Houston Ave | Wilson Rd | 375D | Widen the existing 2-lane asphalt roadway to a 5-lane asphalt pavement2-lanes in each direction with a continuous turn lane). Project was awarded to Angel Brothers on February 23, 2010. Construction activity commenced June 7, 2010 and is scheduled for construction completion by March 3, 2011. (Last Updated On 7/20/2010) |
| Will Clayton Pkwy at Atascocita Rd | 376G | TS&II 2007 Package VI includes (4) intersections: 1) Will Clayton Parkway at Atascocita, 2) Atascocita at Atascocita Meadows, 3) Atascocita at Atasca Oaks Drive and 4) West Little York at Guhn Road. Project was awarded to Durwood Greene on February 23, 2010, construction efforts commenced on May 11, 2010 and construction completion is expected by September 7, 2010. (Last Updated On 6/29/2010) | ||
| Woodland Hills Dr | Woodland Path Dr | Will Clayton Pkwy | 376M 376H | Proposed improvements include widening to a 4-lane concrete boulevard section. Harris County requested Commissioners' Court authorization to bid on April 27, 2010 (the bid and subsequent Award Phase takes approximately 90-120 days to accomplish). The Project was Awarded to D&W Contractors, Inc. on May 25, 2010. A pre-construction meeting will be scheduled and a construction commencement date will be identified upon successful completion of the Award Phase. (Last Updated On 6/29/2010) |