
En EspaƱol
Capital Improvement Projects Database
|
|
| Project Name: |
Fallbrook Dr - B
|
| Limit From: |
Antoine Dr
|
| Limit To: |
E of Halls Bayou
|
| Keymap: |
411B
|
| Notes: |
Widen to a 4-lane concrete boulevard section, with a bridge over Halls Bayou, storm sewer system, sidewalks on the north side of Fallbrook Drive and traffic control devices as warranted. Project is in the engineering design phase and our goal is to request Commissioner's Court authorization to bid the project in the 2nd quarter of 2011. (Last Updated On 6/29/2010)
|
|