Capital Improvement Projects Database
|
|
| Project Name: |
Aldine Westfield Rd at Lexington Woods Dr
|
| Limit From: |
|
| Limit To: |
|
| Keymap: |
292R
|
| Notes: |
The necessary traffic engineering investigations have been accomplished to warrant the installation of a traffic signal system on Aldine Westfield at Lexington Woods. Planned improvements on Aldine Westfield Road at Lexington Woods includes installation of a southbound to eastbound right turn lane and a traffic signal system. A preconstruction meeting is currently being coordinated and is scheduled to occur on Monday, February 18th. The Contractor will then mobilize and complete the Project within 30-days of mobilization (barring any unforeseen circumstances beyond the Contractor’s control). (Last Updated On 2/13/2013)
|
|